Project of subway station "Yuzhnaya" (south station) in Kharkiv - Archive ouverte HAL
Article Dans Une Revue International Journal of Scientific & Engineering Research Année : 2013

Project of subway station "Yuzhnaya" (south station) in Kharkiv

Résumé

Many populous housing estates of Kharkov (Ukraine) outside of pedestrian accessibility of subway stations. For study it was decided to choose Rohan housing estate with population of 10 thousand people and usable area 16 m 2 per resident with poor pedestrian accessibility of trolleybus and bus stops. In order to resolve transportation and living problems was decided place Southern terminal station there along with renewal of resident area. During the project elaboration in first place was placed station, created subway station construction management plan, designed site construction plan and were proved their efficiency. Second, was design future site plan based on evaluated redevelopment and prohibited areas. Eventually, was proved its rationality, economically and safety based on feasibility indicators and limit state method. In result construction period of platform part of station was reduced to three month than traditional standard value and in a comprehensive way is possible to shorten the construction period of station five and a half months. Moreover, first time was proposed reasonable, economical and safe in operating future site plan of terminal station «Yuzhnaya», where maximum usable area per resident totaled after redevelopment of 21 m 2. Data derived in the present study and practical study of innovation at the time of construction and operation of proposed station will attract interest in the following cases: Firstly, at major cities around the world that has developed, subway construction and site plan projects in their suburbs. Secondly, at cities in various parts of the world where subway evolves to suggest their data and solutions of construction process management of station structure subway shallow single vault to include construction plan in the suburbs and site plan with mentioned above prohibited area. Implementation of this project only possible with direct investment of foreign capital, because of 70 million U.S. dollars debt and large costs in renovation and new construction according national standards. Index Terms-site plan of station «Yuzhnaya», construction management, subway station construction management plan, site construction plan, urban renewal, prohibited area, precast reinforced concrete construction method, limit state method.
Fichier principal
Vignette du fichier
Project_of_subway_station_Yuzhnaya_south.pdf (918.44 Ko) Télécharger le fichier
Origine Fichiers éditeurs autorisés sur une archive ouverte
Loading...

Dates et versions

hal-02415999 , version 1 (08-01-2020)

Identifiants

  • HAL Id : hal-02415999 , version 1

Citer

Oleksandr Galychyn. Project of subway station "Yuzhnaya" (south station) in Kharkiv. International Journal of Scientific & Engineering Research, 2013, 4. ⟨hal-02415999⟩
50 Consultations
52 Téléchargements

Partager

More