A risk-reduction approach for optimal software release time determination with the delay incurred cost
Résumé
Most existing research on software release time determination assumes that parameters of the software reliability model (SRM) are deterministic and the reliability estimate is accurate. In practice, however, there exists a risk that the reliability requirement cannot be guaranteed due to the parameter uncertainties in the SRM, and such risk can be as high as 50% when the mean value is used. It is necessary for the software project managers to reduce the risk to a lower level by delaying the software release, which inevitably increases the software testing costs. In order to incorporate the managers' preferences over these two factors, a decision model based on multi-attribute utility theory (MAUT) is developed for the determination of optimal risk-reduction release time.