A two-phase method for the Shift Design and Personnel Task Scheduling Problem with Equity objective - Archive ouverte HAL Access content directly
Journal Articles International Journal of Production Research Year : 2015

A two-phase method for the Shift Design and Personnel Task Scheduling Problem with Equity objective

Abstract

In this paper, we study the Shift Design and Personnel Task Scheduling Problem with Equity objective (SDPTSP-E), initially introduced in [11]. This problem consists in designing the shifts of workers and assigning a set of tasks to quali ed workers, so as to maximise the equity between workers. We propose a natural two-phase approach consisting in rst designing shifts and then assigning tasks to workers, and we iterate between these two phases to improve solutions. We compare our experimental results with existing literature and show that our approach outperforms previous known results.
Fichier principal
Vignette du fichier
article.pdf (257.97 Ko) Télécharger le fichier
Origin : Files produced by the author(s)
Loading...

Dates and versions

hal-01061904 , version 1 (08-09-2014)

Identifiers

Cite

Damien Prot, Tanguy Lapègue, Odile Bellenguez-Morineau. A two-phase method for the Shift Design and Personnel Task Scheduling Problem with Equity objective. International Journal of Production Research, 2015, pp.1-13. ⟨10.1080/00207543.2015.1037023⟩. ⟨hal-01061904⟩
425 View
407 Download

Altmetric

Share

Gmail Facebook Twitter LinkedIn More