A two-phase method for the Shift Design and Personnel Task Scheduling Problem with Equity objective - Archive ouverte HAL
Article Dans Une Revue International Journal of Production Research Année : 2015

A two-phase method for the Shift Design and Personnel Task Scheduling Problem with Equity objective

Résumé

In this paper, we study the Shift Design and Personnel Task Scheduling Problem with Equity objective (SDPTSP-E), initially introduced in [11]. This problem consists in designing the shifts of workers and assigning a set of tasks to quali ed workers, so as to maximise the equity between workers. We propose a natural two-phase approach consisting in rst designing shifts and then assigning tasks to workers, and we iterate between these two phases to improve solutions. We compare our experimental results with existing literature and show that our approach outperforms previous known results.

Domaines

Informatique
Fichier principal
Vignette du fichier
article.pdf (257.97 Ko) Télécharger le fichier
Origine Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

hal-01061904 , version 1 (08-09-2014)

Identifiants

Citer

Damien Prot, Tanguy Lapègue, Odile Bellenguez-Morineau. A two-phase method for the Shift Design and Personnel Task Scheduling Problem with Equity objective. International Journal of Production Research, 2015, pp.1-13. ⟨10.1080/00207543.2015.1037023⟩. ⟨hal-01061904⟩
449 Consultations
493 Téléchargements

Altmetric

Partager

More