SARAF MEBT Commissioning

Résumé

SNRC in Israel is in the process of constructing a neutron production accelerator facility called SARAF. The facility will utilize a linac to accelerate a 5 mA CW deuteron and proton beam up to 40 MeV. In the first phase of the project, SNRC completed construction and operation of a linac (referred to as SARAF Phase I) which included an ECR ion source, a Low-Energy Beam Transport (LEBT) line, and a 4-rod RFQ. The second phase of the project involves collaboration between SNRC and Irfu in France to manufacture the linac. The injector control system has been updated and the Medium Energy Beam Transport (MEBT) line has been installed and integrated into the infrastructure. Recent testing and commissioning of the injector and MEBT with 5 mA CW protons and 5 mA pulsed Deuterons, completed in 2022 and 2023, will be presented and discussed. A special attention will be paid to the experimental data processing with the Bayesian inference of the parameters of a digital twin.

Mots clés

Fichier non déposé

Dates et versions

hal-04543351 , version 1 (12-04-2024)

Identifiants

Citer

Nicolas Pichoff, Antoine Chancé, Jonathan Dumas, Francoise Gougnaud, Arik Kreisel, et al.. SARAF MEBT Commissioning. 68th ICFA Advanced Beam Dynamics workshop on high-Intensity and High-Brightness Hadron Beams, Oct 2023, Geneva, Switzerland. pp.TUA3I4, ⟨10.18429/JACoW-HB2023-TUA3I4⟩. ⟨hal-04543351⟩
21 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More