Final Results of the SPIRAL2 Injector Commissioning - Archive ouverte HAL
Communication Dans Un Congrès Année : 2019

Final Results of the SPIRAL2 Injector Commissioning

Résumé

The SPIRAL2 injector, made up of a 5 mA p-d ion source, a 1 mA heavy ion source (up to A/Q = 3) and a CW 0.75 MeV/u RFQ, has been commissioned in parallel with the superconducting linac installation. This com-missioning is successfully completed now and the Diag-nostic plate (D-plate) used to characterize the injector beams is removed. This paper presents the results ob-tained with the reference particles (H⁺, 4He2+, 18O6+ and 40Ar14+) and a comparison with the simulations. The connexion to the SC linac and the future linac beam commissioning is briefly described.

Mots clés

Fichier non déposé

Dates et versions

hal-02188089 , version 1 (18-07-2019)

Identifiants

Citer

Robin Ferdinand, Marco Di Giacomo, Hanna Franberg, Jean-Michel Lagniel, Guillaume Normand, et al.. Final Results of the SPIRAL2 Injector Commissioning. 10th International Particle Accelerator Conference, May 2019, Melbourne, Australia. pp.MOPTS006, ⟨10.18429/JACoW-IPAC2019-MOPTS006⟩. ⟨hal-02188089⟩
82 Consultations
0 Téléchargements

Altmetric

Partager

More