Intermediate Commissioning Results of the Required 140 mA/100 keV CW D⁺ ECR Injector of LIPAc, IFMIF's Prototype - Archive ouverte HAL
Communication Dans Un Congrès Année : 2017

Intermediate Commissioning Results of the Required 140 mA/100 keV CW D⁺ ECR Injector of LIPAc, IFMIF's Prototype

Pierre-Yves Beauvais
  • Fonction : Auteur
Luca Bellan
  • Fonction : Auteur
Philippe Cara
  • Fonction : Auteur
Michele Comunian
  • Fonction : Auteur
Hervé Dzitko
  • Fonction : Auteur
Enrico Fagotti
  • Fonction : Auteur
Roland Heidinger
  • Fonction : Auteur
Ryo Ichimiya
  • Fonction : Auteur
Akira Ihara
  • Fonction : Auteur
Atsushi Kasugai
  • Fonction : Auteur
Toshihiko Kitano
  • Fonction : Auteur
Juan Knaster
  • Fonction : Auteur
Masao Komata
  • Fonction : Auteur
Keitaro Kondo
  • Fonction : Auteur
Alvaro Marqueta
  • Fonction : Auteur
Koichi Nishiyama
  • Fonction : Auteur
Yoshikazu Okumura
  • Fonction : Auteur
Andrea Pisent
  • Fonction : Auteur
Giuseppe Pruneri
  • Fonction : Auteur
Keishi Sakamoto
  • Fonction : Auteur
Francesco Scantamburlo
  • Fonction : Auteur
Takahiro Shinya
  • Fonction : Auteur
Masayoshi Sugimoto
  • Fonction : Auteur

Résumé

The LIPAc accelerator aims to operate in Rokkasho Fusion Institute a 125 mA/CW deuteron beam at 9 MeV to validate the concept of IFMIF's accelerators that will operate in CW 125 mA at 40 MeV. The 2.45 GHz ECR injector developed by CEA-Saclay is designed to deliver 140 mA/100 keV CW D⁺ beam with 99% D⁺ fraction ratio. Its LEBT relies on a dual solenoid focusing system to transport and match the beam into the RFQ. The normalized RMS emittance at the RFQ injection cone is required to be within 0.25π mm·mrad to allow 96% transmission through the 9.81 m long RFQ. An equal perveance H⁺ beam of half current and half energy as nominal with D⁺ is used to avoid activation during commissioning. The injector commissioning at Rokkasho is divided into three phases to characterize the emittance between the two solenoids of the LEBT (A1) and just downstream the RFQ injection cone (A2) and the extraction system of the source (A3). Phase A1 has been achieved and phase A2 continues in 2016 in order to reach the required beam parameters and to match the beam into the RFQ. This paper reports the commissioning results of phase A1 and the intermediate ones of phase A2 for H⁺ and D⁺ beams.

Mots clés

Fichier non déposé

Dates et versions

hal-01704952 , version 1 (08-02-2018)

Identifiants

Citer

Benoit Bolzon, Pierre-Yves Beauvais, Luca Bellan, Philippe Cara, Nicolas Chauvin, et al.. Intermediate Commissioning Results of the Required 140 mA/100 keV CW D⁺ ECR Injector of LIPAc, IFMIF's Prototype. 22nd International Workshop on ECR Ion Sources, Aug 2016, Busan, South Korea. pp.WECO01, ⟨10.18429/JACoW-ECRIS2016-WECO01⟩. ⟨hal-01704952⟩
134 Consultations
0 Téléchargements

Altmetric

Partager

More