The SARAF-LINAC Project 2017 Status

Dan Berkovits
  • Fonction : Auteur

Résumé

SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the superconducting linac (SARAF-LINAC Project). This paper presents to the accelerator community the status at March 2017 of the SARAF-LINAC Project.