Homogeneously non-idling schedules of unit-time jobs on identical parallel machines - Archive ouverte HAL
Article Dans Une Revue Discrete Applied Mathematics Année : 2013

Homogeneously non-idling schedules of unit-time jobs on identical parallel machines

Résumé

In this paper, we study the basic homogeneous mm-machine scheduling problem where weakly dependent unit-time jobs have to be scheduled within the time windows between their release dates and due dates so that, for any subset of machines, the set of the time units at which at least one machine is busy, is in interval. We first introduce the notions of pyramidal structure, kk-hole, mm-matching, preschedule, kk-schedule and schedule for this problem. Then we provide a feasibility criteria for a preschedule. The key result of the paper is then to provide a structural necessary and sufficient condition for an instance of the problem to be feasible. We conclude by giving the directions of ongoing works and by bringing open questions related to different variants of the basic non-idling mm-machine scheduling problem.

Dates et versions

hal-01366540 , version 1 (14-09-2016)

Identifiants

Citer

Alain Quilliot, Philippe Chrétienne. Homogeneously non-idling schedules of unit-time jobs on identical parallel machines. Discrete Applied Mathematics, 2013, 161, pp.1586-1597. ⟨10.1016/j.dam.2013.01.019⟩. ⟨hal-01366540⟩
89 Consultations
0 Téléchargements

Altmetric

Partager

More