Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date

Celso Sakuraba
  • Fonction : Auteur
Débora Ronconi
  • Fonction : Auteur

Résumé

This paper addresses the minimization of the mean absolute deviation from a common due date in a two-machine flowshop scheduling problem. We present heuristics that use an algorithm, based on proposed properties, which obtains an optimal schedule for a given job sequence. A new set of benchmark problems is presented with the purpose of evaluating the heuristics. Computational experiments show that the developed heuristics outperform results found in the literature for problems up to 500 jobs.

Dates et versions

hal-01185237 , version 1 (19-08-2015)

Identifiants

Citer

Celso Sakuraba, Débora Ronconi, Francis Sourd. Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date. Computers and Operations Research, 2009, 36 (1), pp.60-72. ⟨10.1016/j.cor.2007.07.005⟩. ⟨hal-01185237⟩
44 Consultations
0 Téléchargements

Altmetric

Partager

More