Erratum to: "Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan" [Int. J. Prod. Econ. 112 (2008) 161-167] - Archive ouverte HAL Accéder directement au contenu
Article Dans Une Revue International Journal of Production Economics Année : 2014

Erratum to: "Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan" [Int. J. Prod. Econ. 112 (2008) 161-167]

Fichier non déposé

Dates et versions

hal-00963734 , version 1 (21-03-2014)

Identifiants

Citer

Marie-Laure Espinouse, Ahmed Gara-Ali. Erratum to: "Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan" [Int. J. Prod. Econ. 112 (2008) 161-167]. International Journal of Production Economics, 2014, 153, pp.361-363. ⟨10.1016/j.ijpe.2014.02.018⟩. ⟨hal-00963734⟩
106 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More