Erratum to "Scheduling of a two-machine flowshop with availability constraints on the first machine" [International Journal of Production Economics 99 (2006)]
Résumé
In Allaoui H., Artiba A., Elmaghraby S.E., Riane F. Scheduling of a two-machine flowshop with availability constraints on the first machine. International Journal of Production Economics 99 (2006) two conditions of optimality for the Johnson sequence are given. We establish in this note that these conditions are false, under the resumable and the non-resumable case. We also point out two incorrect proofs and give evidence that the time complexity of their dynamic approach is very unlikely to be correct
Domaines
Recherche opérationnelle [math.OC]Origine | Fichiers produits par l'(les) auteur(s) |
---|