Installation process of suction anchors in Gulf of Guinea clay : Centrifuge modelling - Archive ouverte HAL Accéder directement au contenu
Communication Dans Un Congrès Année : 2010

Installation process of suction anchors in Gulf of Guinea clay : Centrifuge modelling

Résumé

The preparation process of a deepwater Gulf of Guinea clay for modelling of 24 m long suction anchors at a scale of 1/100 in the LCPC centrifuge, the clay characteristics and the installation phase (self-weight and suction) are presented. Two types of caissons have been tested in each tub : one with stiffeners and the other without stiffener. The embedment ratio is close to the suction caisson's slenderness of 3. An analysis of the forces of suction and soil friction shows, as expected, higher soil resistance for caissons with stiffeners.
Fichier non déposé

Dates et versions

hal-00635659 , version 1 (25-10-2011)

Identifiants

  • HAL Id : hal-00635659 , version 1

Citer

Luc Thorel, Jacques Garnier, Gérard Rault, Hédi Dendani, Jl Colliat. Installation process of suction anchors in Gulf of Guinea clay : Centrifuge modelling. 7th international Conference on Physical Modelling in Geotechnics, Jun 2010, France. pp 1057-1062. ⟨hal-00635659⟩
117 Consultations