Beam Instrumentation Performance During Commissioning of the ESS RFQ, MEBT and DTL - Archive ouverte HAL Accéder directement au contenu
Communication Dans Un Congrès Année : 2022

Beam Instrumentation Performance During Commissioning of the ESS RFQ, MEBT and DTL

Thomas Shea
  • Fonction : Auteur
Rafael Baron
  • Fonction : Auteur
Ibon Bustinduy
  • Fonction : Auteur
Clement Derrez
  • Fonction : Auteur
Elena Donegani
  • Fonction : Auteur
Mario Ferianis
  • Fonction : Auteur
Viatcheslav Grishin
  • Fonction : Auteur
Hooman Hassanzadegan
  • Fonction : Auteur
Irena Kittelmann
  • Fonction : Auteur
Hinko Kocevar
  • Fonction : Auteur
Natalia Milas
  • Fonction : Auteur
Daniel Noll
  • Fonction : Auteur
Henrique Silva
  • Fonction : Auteur
Roxana Tarkeshian
  • Fonction : Auteur
Cyrille Thomas
  • Fonction : Auteur

Résumé

In late 2021 through mid 2022, the first protons were accelerated and transported through the European Spallation Source (ESS) Radio Frequency Quadrupole and Medium Energy Transport line at 3.6 MeV, and finally through the first Drift Tube Linac tank at 21 MeV. To enable these achievements, the following beam instrumentation systems were deployed: Ion Source power supply monitors, beam chopping systems, Faraday Cups, Beam Current Monitors (BCM) and Beam Position Monitors (BPM) that also measured phase. Additional systems were deployed for dedicated studies, including Wire Scanners, a slit and grid Emittance Measurement Unit, neutron Beam Loss Monitors and fast BCM and BPM systems. The instrumentation deployment is the culmination of efforts by a partnership of the ESS beam diagnostics section, multiple ESS groups and institutes across the globe. This paper summarizes the beam tests that characterized the performance of the instrumentation systems and verified the achievement of commissioning goals.

Mots clés

Fichier non déposé

Dates et versions

hal-03925266 , version 1 (05-01-2023)

Identifiants

Citer

Thomas Shea, Rafael Baron, Ibon Bustinduy, Clement Derrez, Elena Donegani, et al.. Beam Instrumentation Performance During Commissioning of the ESS RFQ, MEBT and DTL. 11th International Beam Instrumentation Conference, Sep 2022, Cracow, Poland. pp.MOP07, ⟨10.18429/JACoW-IBIC2022-MOP07⟩. ⟨hal-03925266⟩
15 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More