A Model for a Multi-level Disassembly System Under Random Disassembly Lead Times
Résumé
This paper deals with the problem of planned disassembly lead time calculation in a Reverse Material Requirement Planning (RMRP) environment under uncertainty. A multi-level disassembly system with one type of end-of-life product and several types of components at each level is considered for the first time in the disassembly planning problem under uncertainty. The paper presents a mathematical model with corresponding proofs. The objective of the proposed model is to minimise the total expected cost which is composed of holding and backlogging costs. Some advantages of the proposed model and perspectives of this research are discussed.