Integrated quay crane and yard truck scheduling problem at port of Tripoli-Lebanon - Archive ouverte HAL
Article Dans Une Revue Computers & Industrial Engineering Année : 2021

Integrated quay crane and yard truck scheduling problem at port of Tripoli-Lebanon

Résumé

The scheduling problem is one of the most important operation in maritime ports. In this study we solved the scheduling problem for a single quay crane and multiple yard trucks in port of Tripoli-Lebanon. In a previous study we proposed two exact methods for this problem but we faced a problem for large instances in CPU time. For this reason, in this paper we developed a heuristic method (genetic algorithm) to obtain near optimal solution with an acceptable CPU time. The main objective of this paper is to minimize the completion time of all containers from the container vessel to its storage location and to have good results compared with real results in the port of Tripoli-Lebanon.
Fichier principal
Vignette du fichier
S0360835221003521.pdf (791.52 Ko) Télécharger le fichier
Origine Fichiers produits par l'(les) auteur(s)

Dates et versions

hal-03551924 , version 1 (02-08-2023)

Licence

Identifiants

Citer

Ali Skaf, Sid Ahmed Lamrous, Zakaria Hammoudan, Marie-Ange Manier. Integrated quay crane and yard truck scheduling problem at port of Tripoli-Lebanon. Computers & Industrial Engineering, 2021, 159, pp.107448 (11). ⟨10.1016/j.cie.2021.107448⟩. ⟨hal-03551924⟩
39 Consultations
48 Téléchargements

Altmetric

Partager

More