Beam Commissionning SPIRAL2 - Archive ouverte HAL Accéder directement au contenu
Communication Dans Un Congrès Année : 2021

Beam Commissionning SPIRAL2

Résumé

SPIRAL2 is a superconducting linear accelerator which is part of the GANIL accelerator complex in Caen, France. Whole injector, RFQ and diagnostics were validated between 2012 and 2018 and on July 8 th 2019 the authorization to operate SPIRAL2 facility was obtained. Since then, in two 6-month periods, the MEBT line and linac have been commissioned with proton and helium beams. This article presents the results obtained and the comparison with the simulations. Optimization of the platform source voltage to avoid synchrotron oscillation in the RFQ is also presented.
Fichier principal
Vignette du fichier
wexb05.pdf (1.54 Mo) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)

Dates et versions

hal-03508478 , version 1 (03-01-2022)

Identifiants

Citer

A.K. Orduz, M. Di Giacomo, R. Ferdinand, B. Jacquot, O. Kamalou, et al.. Beam Commissionning SPIRAL2. 12th International Particle Accelerator Conference (IPAC 2021), May 2021, Virtual Edition, Brazil. pp.2540-2543, ⟨10.18429/JACoW-IPAC2021-WEXB05⟩. ⟨hal-03508478⟩
65 Consultations
22 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More