Installation, Use and Follow-Up of an Emittance-Meter at the Arronax Cyclotron 70XP - Archive ouverte HAL
Communication Dans Un Congrès Année : 2021

Installation, Use and Follow-Up of an Emittance-Meter at the Arronax Cyclotron 70XP

Freddy Poirier
Robin Bellamy
  • Fonction : Auteur
Chris Castel
  • Fonction : Auteur
Teddy Durand
  • Fonction : Auteur
Xavier Goiziou
  • Fonction : Auteur
Marcel Heine
Charbel Koumeir
Herve Trichet
  • Fonction : Auteur

Résumé

The 70 MeV cyclotron group of the Arronax GIP (Interest Public Group), France, foresees to increase its beam intensity on target. For this, several beam studies are being performed in the various sections of the accelerator including the injection. Thus, an Allison-type emittance-meter has been installed in this section above the cyclotron and downstream a quadrupole triplet. Installation and the first results of a campaign of measurements are presented including high intensity runs, up to 1 mA for 40 keV H⁻ ions. The emittance-meter is expected to be used with several accelerators throughout the world. Therefore, a strategy on the follow-up of the activation of sample materials used in the equipment is being established and is described in the paper.
Fichier non déposé

Dates et versions

hal-03444436 , version 1 (23-11-2021)

Identifiants

Citer

Freddy Poirier, Thomas Adam, Robin Bellamy, Francois Bulteau-Harel, Chris Castel, et al.. Installation, Use and Follow-Up of an Emittance-Meter at the Arronax Cyclotron 70XP. 12th International Particle Accelerator Conference , May 2021, Online, Brazil. pp.MOPAB277, ⟨10.18429/JACoW-IPAC2021-MOPAB277⟩. ⟨hal-03444436⟩
84 Consultations
0 Téléchargements

Altmetric

Partager

More