ESS RFQ: Installation and Tuning at Lund - Archive ouverte HAL
Communication Dans Un Congrès Année : 2021

ESS RFQ: Installation and Tuning at Lund

Résumé

The 352 MHz Radio Frequency Quadrupole (RFQ) for the European Spallation Source ERIC (ESS) has been delivered by the end of 2019. It has been provided by CEA, IRFU, Saclay/France. It consists of five sections with a total length of 4.6 m and accelerates the 70 mA proton beam from 75 keV up to 3.6 MeV. It will be fed with 900 kW peak power through two coaxial loop couplers. The installation process (alignment, vacuum test), as well as the tuning process based on bead-pull measurements, is presented in this paper.
Fichier non déposé

Dates et versions

hal-03435589 , version 1 (18-11-2021)

Identifiants

Citer

Pierrick Hamel, Didier Chirpaz-Cerbat, Michel Desmons, Augustin Dubois, Alain France, et al.. ESS RFQ: Installation and Tuning at Lund. 12th International Particle Accelerator Conference , May 2021, Online, Brazil. pp.TUPAB016, ⟨10.18429/JACoW-IPAC2021-TUPAB016⟩. ⟨hal-03435589⟩
43 Consultations
0 Téléchargements

Altmetric

Partager

More