Integrating yard, network and optimisation models towards real-time optimisation of rail freight yard operations - Archive ouverte HAL
Article Dans Une Revue Ingegneria Ferroviaria Année : 2020

Integrating yard, network and optimisation models towards real-time optimisation of rail freight yard operations

Résumé

This paper describes the state of advancement achieved in the OptiYard research project in the use of optimisation algorithms in interaction with microsimulation of the rail-yard and surrounding network towards real-time yard management and communication with the network. Two case studies, a hump marshalling yard (mainly Single Wagon Load traffic) and a flat shunting yard (mainly intermodal traffic), were represented with state-of-the art microsimulation models, combined with innovative optimisation algorithms. Some specialistic information on the nature of the models is provided. However, the focus is oriented to railway engineers, with a description of the interactions between the models in producing outputs that are useful both to the yard dispatcher (decisions on staff, track, locomotive assignment, order of operations) and the infrastructure manager of the surrounding network (expected times of departure, availability of tracks in the yard).
Fichier principal
Vignette du fichier
doc00031770.pdf (1.36 Mo) Télécharger le fichier
Origine Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

hal-02951523 , version 1 (28-09-2020)

Identifiants

  • HAL Id : hal-02951523 , version 1

Citer

Riccardo Licciardello, Norbert Adamko, Samuel Deleplanque, Pierre Hosteins, Ronghui Liu, et al.. Integrating yard, network and optimisation models towards real-time optimisation of rail freight yard operations. Ingegneria Ferroviaria, 2020, 6, 21p. ⟨hal-02951523⟩
176 Consultations
255 Téléchargements

Partager

More