4D/BIM simulation for pre-construction and construction scheduling. Multiple levels of development within a single case study

Résumé

4D modeling has been an applied research area for around two decades since the first seminal works. In the last years, a number of case studies have been published both for demonstrating the various applications of 4D and for assessing technological propositions. However, in most papers only little place is given to the particular content of 4D models. In parallel, following the growing implementation of Building Information Modelling, 4D is usually recognized as a "BIM use". In BIM protocols, the Level Of Development of datasets is a fundamental issue. This paper describes two distinct 4D uses conducted on a single pilot project. They aim to assess the levels of graphical and temporal details required for the implemented uses. The authors finally discuss the diversity of 4D uses with 4D models, both planned or ad-hoc, as well as the logical understanding related to 4D LOD.
Fichier principal
Vignette du fichier
Cahiers_Recherche_2017_5vweb.pdf (295.87 Ko) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

hal-02890081 , version 1 (10-07-2020)

Identifiants

  • HAL Id : hal-02890081 , version 1

Citer

Conrad Boton, Sylvain Kubicki, Gilles Halin. 4D/BIM simulation for pre-construction and construction scheduling. Multiple levels of development within a single case study. Creative Construction Conference 2015, Jul 2015, Cracovie, Poland. ⟨hal-02890081⟩

Collections

CNRS MAP MAP-CRAI
188 Consultations
553 Téléchargements

Partager

Gmail Facebook X LinkedIn More