Using flow assessment to identify a scheduling problem with waste reduction concerns: a case study
Résumé
This paper proposes a first insight on how flow assessment can support the identification and modeling of waste-minimizing shop-floor scheduling problems. Using relevant elements from existing flow assessment methods, a four-step methodology is devised. After an overview of the different steps, a case study of hubcap manufacturing is conducted. The outcome of this case study is an identified scheduling problem with clearly defined constraints, objectives and parameters. The economic and environmental impacts are both quantified, and decision variables for problem solving are provided.
Domaines
Ingénierie de l'environnement
Fichier principal
Le Hesran et al. - 2019 - Using flow assessment to identify a scheduling problem with waste reduction concerns a case study.pdf (1.01 Mo)
Télécharger le fichier
Origine | Fichiers produits par l'(les) auteur(s) |
---|
Loading...