Status of SPIRAL2 and RFQ Beam Commissioning

Résumé

The SPIRAL2 project beam commissioning is started and the superconducting linac installation is being finalized. In parallel with the installations, the first proton beam was extracted in 2014 and the expected beam performances were achieved from both light and heavy ion sources. The conditioning of the RFQ started in October 2015, and the beam commissioning soon after that. After having briefly recalled the project scope and parameters, the present situation of the RFQ beam commissioning is presented.

Mots clés

Fichier non déposé

Dates et versions

hal-01645940 , version 1 (23-11-2017)

Identifiants

Citer

Robin Ferdinand, Patrick Bertrand, Jean-Luc Biarrotte, Marco Di Giacomo, Hanna Franberg, et al.. Status of SPIRAL2 and RFQ Beam Commissioning. 28th International Linear Accelerator Conference, Sep 2016, East Lansing, United States. pp.WE1A06, ⟨10.18429/JACoW-LINAC2016-WE1A06⟩. ⟨hal-01645940⟩
127 Consultations
0 Téléchargements

Altmetric

Partager

More