Three stage no-idle flow-shops - Archive ouverte HAL Accéder directement au contenu
Article Dans Une Revue Computers & Industrial Engineering Année : 2003

Three stage no-idle flow-shops

Résumé

The three stage no-idle flow-shop configuration, where machines work continuously without idle intervals, is an interesting manufacturing environment in many industries. Few researches have investigated this type of systems. The idle characteristic is a very strong constraint and it affects seriously the value of makespan (C max) criterion. We treat here the scheduling problem of three stage permutation flow-shop configuration with no-idle machines in order to minimise the makespan Full-size image (<1 K) An easily implementing heuristic is proposed to solve this problem with Full-size image (<1 K) complexity. It finds optimal solutions for several cases. A computational study shows the result quality.

Dates et versions

hal-01468778 , version 1 (15-02-2017)

Identifiants

Citer

Nour El Houda Saadani, Alain Guinet, Mohamed Moalla. Three stage no-idle flow-shops. Computers & Industrial Engineering, 2003, 44 (3), pp.425 - 434. ⟨10.1016/S0360-8352(02)00217-6⟩. ⟨hal-01468778⟩
52 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More