Large-scale Unit Commitment under uncertainty - Archive ouverte HAL Accéder directement au contenu
Article Dans Une Revue 4OR: A Quarterly Journal of Operations Research Année : 2015

Large-scale Unit Commitment under uncertainty

Résumé

The Unit Commitment problem in energy management aims at finding the optimal productions schedule of a set of generation units while meeting various system-wide constraints. It has always been a large-scale, non-convex difficult problem, especially in view of the fact that operational requirements imply that it has to be solved in an unreasonably small time for its size. Recently, the ever increasing capacity for renewable generation has strongly increased the level of uncertainty in the system, making the (ideal) Unit Commitment model a large-scale, non-convex, uncertain (stochastic, robust, chance-constrained) program. We provide a survey of the literature on methods for the Uncertain Unit Commitment problem, in all its variants. We start with a review of the main contributions on solution methods for the deterministic versions of the problem, focusing on those based on mathematical programming techniques that are more relevant for the uncertain versions of the problem. We then present and categorize the approaches to the latter, also providing entry points to the relevant literature on optimization under uncertainty.
Fichier principal
Vignette du fichier
Tahanan2015.pdf (757.46 Ko) Télécharger le fichier
Origine : Fichiers produits par l'(les) auteur(s)
Loading...

Dates et versions

hal-01340333 , version 1 (03-02-2020)

Licence

Paternité

Identifiants

Citer

Milad Tahanan, Wim van Ackooij, Antonio Frangioni, Fabrizio Lacalandra. Large-scale Unit Commitment under uncertainty. 4OR: A Quarterly Journal of Operations Research, 2015, 13 (2), pp.115-171. ⟨10.1007/s10288-014-0279-y⟩. ⟨hal-01340333⟩
168 Consultations
339 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More